DOWNTOWN CHURCH
HOME BLOG Brick + Mortar
GIVE
Worship Kids SERMONS
Connect Home Groups YOUTH Tiny Theologians Trips DISCOVER DOWNTOWN 2025 Learn Serve
Stories + Stones Staff Elders Contact + Forms
HOME WORSHIP Worship Kids SERMONS BLOG CONNECT Connect Home Groups YOUTH Tiny Theologians Trips DISCOVER DOWNTOWN 2025 Learn Serve Brick + Mortar ABOUT Stories + Stones Staff Elders Contact + Forms
DOWNTOWN CHURCH
GIVE
2018-11-16 CE - 13.jpg
Future Home of DOWNTOWN CHURCH

Future Home of DOWNTOWN CHURCH

On December 6, 2017, DTC was gifted the former Central Energy Facility to renovate into their new church home.

Rear View of the Former Central Energy Facility

Rear View of the Former Central Energy Facility

Cooling towers and shed

IMG_6521.JPG
Rear view including former cooling towers

Rear view including former cooling towers

Cooling towers located behind the building.

View from Gregg Street

View from Gregg Street

Central Energy Facility in the spring of 2017

Underground Fuel Tank removal

Underground Fuel Tank removal

Three 30,000 gallon underground storage tanks were removed in the summer of 2017.  Once removed an environmental study was conducted giving the property a clean report. 

Underground storage tanks

Underground storage tanks

Underground storage tanks

Underground storage tanks

Hammer Construction removal of underground storage tanks

Hammer Construction removal of underground storage tanks

Interior Pre-demolition

Interior Pre-demolition

The Central Energy Facility housed equipment for powering the entire BullStreet campus.

Interior pre-demolition

Interior pre-demolition

Interior of CEF

Interior of CEF

At the start of demolition, the former energy facility housed the equipment that powered the entire BullStreet campus.

Interior view

Interior view

This view is looking towards the back of the building

Pipes and equipment

Pipes and equipment

Pipes near entrance

Pipes near entrance

Interior

Interior

Interior with equipment

Interior with equipment

Former Shed area

Former Shed area

A 6,500 sq ft shed was removed to make room for green space. 

View of former shed space from rear

View of former shed space from rear

Removal of the shed enabled a view of the baseball stadium.

IMG_4526.JPG
Front corner

Front corner

Front corner of building - future glassed in area.  

IMG_4521.JPG
Calhoun side - future glass garage doors

Calhoun side - future glass garage doors

The side of the building will open up to a paved courtyard with 3 large glass garage doors.  Perfect for letting natural light in.  

Equipment removal

Equipment removal

IMG_4589.jpg
 Adding trenches for plumbing

Adding trenches for plumbing

 Structure for interior rooms 

Structure for interior rooms 

 Front corner on Gregg Street

Front corner on Gregg Street

 Steel Stacks 

Steel Stacks 

 Future entrance

Future entrance

 New bathrooms

New bathrooms

Future Courtyard

Future Courtyard

IMG_4859.JPG
IMG_4866.JPG
IMG_4867.JPG
IMG_4830.JPG
IMG_4826.JPG
IMG_4874.JPG
IMG_4916.JPG
IMG_4914.JPG
IMG_9108.jpeg
IMG_9106.jpeg
IMG_9109.jpeg
mS8KBvQeTWOhIGEiG428Eg.jpg
Second Floor

Second Floor

IMG_5294.JPG
IMG_5314.JPG
IMG_5564.JPG
IMG_5228.JPG
IMG_5566.JPG
IMG_5565.JPG
IMG_5293.JPG
IMG_5547.JPG
IMG_5316.JPG
IMG_5569.JPG
2018-11-16 CE - 1.jpg
2018-11-16 CE - 2.jpg
2018-11-16 CE - 3.jpg
2018-11-16 CE - 4.jpg
2018-11-16 CE - 5.jpg
2018-11-16 CE - 6.jpg
2018-11-16 CE - 7.jpg
2018-11-16 CE - 8.jpg
2018-11-16 CE - 9.jpg
2018-11-16 CE - 10.jpg
2018-11-16 CE - 11.jpg
2018-11-16 CE - 12.jpg
2018-11-16 CE - 14.jpg
2018-11-16 CE - 15.jpg
2018-11-16 CE - 16.jpg
2018-11-16 CE - 17.jpg
2018-11-16 CE - 18.jpg
2018-11-16 CE - 19.jpg
2018-11-16 CE - 20.jpg
2018-11-16 CE - 21.jpg
2018-11-16 CE - 22.jpg
2018-11-16 CE - 23.jpg
2018-11-16 CE - 24.jpg
2018-11-16 CE - 25.jpg
2018-11-16 CE - 26.jpg
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82
Previous Next
2018-11-16 CE - 13.jpg
Future Home of DOWNTOWN CHURCH
Rear View of the Former Central Energy Facility
IMG_6521.JPG
Rear view including former cooling towers
View from Gregg Street
Underground Fuel Tank removal
Underground storage tanks
Underground storage tanks
Hammer Construction removal of underground storage tanks
Interior Pre-demolition
Interior pre-demolition
Interior of CEF
Interior view
Pipes and equipment
Pipes near entrance
Interior
Interior with equipment
Former Shed area
View of former shed space from rear
IMG_4526.JPG
Front corner
IMG_4521.JPG
Calhoun side - future glass garage doors
Equipment removal
IMG_4589.jpg
 Adding trenches for plumbing
 Structure for interior rooms 
 Front corner on Gregg Street
 Steel Stacks 
 Future entrance
 New bathrooms
Future Courtyard
IMG_4859.JPG
IMG_4866.JPG
IMG_4867.JPG
IMG_4830.JPG
IMG_4826.JPG
IMG_4874.JPG
IMG_4916.JPG
IMG_4914.JPG
IMG_9108.jpeg
IMG_9106.jpeg
IMG_9109.jpeg
mS8KBvQeTWOhIGEiG428Eg.jpg
Second Floor
IMG_5294.JPG
IMG_5314.JPG
IMG_5564.JPG
IMG_5228.JPG
IMG_5566.JPG
IMG_5565.JPG
IMG_5293.JPG
IMG_5547.JPG
IMG_5316.JPG
IMG_5569.JPG
2018-11-16 CE - 1.jpg
2018-11-16 CE - 2.jpg
2018-11-16 CE - 3.jpg
2018-11-16 CE - 4.jpg
2018-11-16 CE - 5.jpg
2018-11-16 CE - 6.jpg
2018-11-16 CE - 7.jpg
2018-11-16 CE - 8.jpg
2018-11-16 CE - 9.jpg
2018-11-16 CE - 10.jpg
2018-11-16 CE - 11.jpg
2018-11-16 CE - 12.jpg
2018-11-16 CE - 14.jpg
2018-11-16 CE - 15.jpg
2018-11-16 CE - 16.jpg
2018-11-16 CE - 17.jpg
2018-11-16 CE - 18.jpg
2018-11-16 CE - 19.jpg
2018-11-16 CE - 20.jpg
2018-11-16 CE - 21.jpg
2018-11-16 CE - 22.jpg
2018-11-16 CE - 23.jpg
2018-11-16 CE - 24.jpg
2018-11-16 CE - 25.jpg
2018-11-16 CE - 26.jpg

MAIL AND CUPCAKE DELIVERY

2030 Gregg Street
Columbia, SC 29201

803.875.0156

QUICK LINKS

Sermon Audio
Sundays
Membership
Baptisms
Staff
Contact
 

 

Sign up to receive news and updates.

Hooray!!! Check your inbox for a confirmation email and then you are on the list!

leafnobackground.png
DOWNTOWN CHURCH
2030 Gregg Street,
Columbia, SC 29201,
United States
803.875.0156 connect@downtownchurch.me
Hours
Mon 9am to 5pm
Tue 9am to 5pm
Wed 9am to 5pm
Thu 9am to 5pm
Sun 10am to 11:15am
Privacy Policy